Field Safety Coordinators needed - Data Center Construction Lancaster, TX Job at Code Red Safety, Lancaster, TX

eFllOHFhS05PMjE5UjlQNVNvdmZ6VTVy
  • Code Red Safety
  • Lancaster, TX

Job Description

Code Red Safety is looking several Field Safety Coordinators with construction and electrical experience for a large commercial construction project in the Dallas area. This project is already underway, and these safety roles will begin immediately. The work is expected to run for 3-6 months working 60+hrs/wk.

Applicants MUST meet the following requirements:
  • Have 3-5 years of construction safety experience
  • Must have at least one of the following: OSHA 30, OSHA 510, OSHA 500, CSSS, CSST, CHST, CSHO or similar
  • Experience with  electrical safety and the NFPA 70E certification is preferred
  • Have a valid FA/CPR card
  • Must be able to pass a drug test & background check. 
Code Red Safety specializes in placing qualified Safety Professionals into large industrial and commercial construction projects nationwide on a 1099 independent contract basis. If you meet the above qualifications and are interested in the position, please apply. If you are determined to be a good candidate for this project, we will be in touch to discuss additional details. 

Job Tags

Contract work, Immediate start,

Similar Jobs

Stride, Inc.

Substitute Elementary Teacher (contractor) Job at Stride, Inc.

 ...and Licenses: * Colorado Teaching Certification Required Residency Requirements: Colorado The remote Substitute High School Teacher at our High School campus, is a highly qualified, state certified educator responsible for delivering specific course... 

Walmart Inc.

Senior Designer, Fashion - Kids Fashion Job at Walmart Inc.

 ...Position Summary... What you'll do... Senior Designer, Fashion - Kids Fashion Relocation required to NYC. As a...  ...assortment planning, supplier collaboration, material development, sustainability initiatives, and cross-functional teamwork. Key... 

Delta Health Center

LPN Job at Delta Health Center

 ...documentation on referrals well-organized, detail-oriented Work independently and unsupervised maintaining superior work ethic...  ...year (Preferred) License/Certification: LVN (Preferred) LPN (Preferred) Work Location: In person Requirements... 

Peraton

MHS Genesis Tier 2 Analyst (SCA) Job at Peraton

 ...position. ~ Ability to obtain Department of Defense security clearance (ADP II Public Trust)~ Must have experience using with Cerner Millenium/MHS Genesis ~ Demonstrated knowledge of Service Desk support methodology ~ Relevant technical certifications or relevant... 

TLC Healthforce

Travel Licensed Practical Nurse LPN Job Job at TLC Healthforce

Seize the opportunity to elevate your LPN career in Watertown, New York, on a dynamic travel assignment designed for Licensed Practical Nurses who lead with compassion, clinical acumen, and a drive to make a tangible difference in patient outcomes. As an LPN on this program...